Case Study

Watching the roots while the machines moved in.

Root excavation oversight and barrier checks across a multi-stage build.

The problem

A multi-stage build ran inside the tree protection zones of retained trees. The permit said an arborist had to be on site for excavation and barrier checks. One illegal root cut, one missing fence, and the job stops — a council notice, a fine, and a tree that fails two summers later.

The solution

We stood the hold-points. Hand and hydro-vac excavation inside the TPZ was watched. Fencing was inspected before each new stage. Root encounters were written down the same day, with the treatment the builder had to do before work continued.

The outcome

The program finished without a stop-work notice. The retained trees were still standing when the machines left.

Tree protection zone fencing on a construction site
Barrier in place before the next stage — a permit condition you can photograph.
On-site review of tree protection with the build team
Hold-points with the builder, on the dirt, not only in the report.
Root investigation during construction
When a root is found, it is measured and treated — not guessed later.

Property details omitted.

What we did

  • Supervised hand and hydro-vac excavation inside the protection zones
  • Inspected and reinstated tree protection fencing before each new stage
  • Certified compliance for the builder at every hold point
  • Documented any root encounters and recommended immediate treatments